求翻译成英文: 一周以后英文求翻译

4672℃ LUCILLE

求翻译成英文:一周以后英文求翻译

求翻译成英文。

This design properties for the design of the hydraulic structures, including the construction of the main gate partially stabilized and structural design, as well as the Chamber floor and other major components of the design. The first combined with the Water Conservancy and other expertise, the theory of practice and walkthrough of professional design. Item's bean sluice gate as a single irrigation, after years of running exposed many problems, this time to redesign, the gate to irrigation into design flows to sluice, 1.5m3/s, floor elevation is 35.5m, instead people electric water-cooled screw headstock, according to a new level design: 8m dike width, slope coefficient 1: 3, Dyke Crest elevation 41.78m. This article describes the main gate of design and computation process, was the first to be designed, sluice layout calculation buildings main dimensions or according to the code value, and then on the main buildings for stability analysis, structure calculation, as well as the concrete floor. These include the following sections 1. Hole design 2. Energy design 3. Impervious drainage design 4. Chamber's layout and stability analysis of 5. Floor structure calculation

求中文翻译成英文

My colleague BB will book a room for Mr. a in Pullmn as soon as possible, after that I will send you the booking confirmation.

求 翻译成英文

Abstract: Electric power system is to redistribute power system power step-down power to the plant or the workshop all to it by the step-down substation plant, high voltage distribution lines, plant and substation, low voltage distribution lines and use composed of electrical equipment. The total step-down substation plant and distribution system design, each workshop is based and the nature of the load Shu Liang, Shengchangongyi to load requirements, and the Fu He layout, combined with the national power supply Qingkuang. Jiejue on Gebu Men's safe and reliable, Jing Ji Technology the distribution of power problems. The basic elements are the following: the choice of the incoming line voltage, the location of electrical substation design and protection, short circuit current calculation, electrical equipment selection, plant location and transformer substation number, capacity choice, lightning protection and grounding equipment design.

Key words: plant substation for power distribution, short circuit current, lightning protection grounding device, electrical design

求翻译成英文。

1. In the work caution will greatly. (pay)

2. I had only enough money in the U.S. with a year. (see through)

3. The results showed that he had never been in that company. (turn out)

4. Stare eye to see is not polite. (manners)

5. Outside is too noisy and I can't concentrate on work. (concentrat on)

6. The board of directors elected him as general manager of the company. (select)

7. Grilled chicken is the Thai restaurant in my favorite food. (favorite)

8. We eat dessert after the main course is an ice cream. (course)

TAG: 英文